Project: Musselwhite
Location: Pickle Lake, ON Canada
Rotation: 14 days on, 14 days off
Shift Length: 12 hours
Salary Range: $118,000 - $168,000/annum, range is variable and dependent on overtime worked and production bonus paid
Travel: Flight from airport closest to point of hire to Thunder Bay - Chartered flight to site
Accommodation: Remote Camp setting
Benefits: Redpath offers comprehensive benefits including but not limited to health, dental and vision care, life insurance, pension and employee assistance program
Pre-employment requirement: Drug and Alcohol Testing
Scope of work:
Complete the underground construction, installation, testing, and commissioning of the 1470mL Pump Station and associated dewatering infrastructure at Musselwhite Mine as part of the PQD Expansion 1 project.
The work includes installation of two cone sumps with ground support and shotcrete, structural steel cones and access platforms, sump covers and monorails, dewatering pump skids, sludge sump infrastructure, piping and pipe supports, and associated civil/structural works. The scope also includes power distribution, electrical, instrumentation, automation and communications systems, borehole cable installations, and dewatering piping from the 1080mL borehole to the 1045mL water reservoir.
Duration approximately 6 to 8 months
Job Summary:
Reporting to the Construction Superintendent, the Underground Construction/Welder is responsible for direct or indirect support of mining operations by assuming responsibility for the assembling and welding steel components for various construction materials and components.